Water Main POF (1)
| <=1 |
| >1, <=2 |
| >2, <=3 |
| >3, <=4 |
| >4 |
Sanitary Main POF (2)
| <=1 |
| >1, <=2 |
| >2, <=3 |
| >3, <=4 |
| >4 |
Drainage Main POF (3)
| <=1 |
| >1, <=2 |
| >2, <=3 |
| >3, <=4 |
| >4 |
Water Main Abandonment (4)
Proposed Metro Vancouver Water Mains (5)
| 2019-2021 |
| 2020-2022 |
| 2021-2023 |
| 2023-2025 |
FortisBC Planned Projects (6)
Drainage Mains (7)
| Proposed |
| In Service/For Construction |
| Abandoned |
Sanitary Mains (8)
| Proposed |
| InService/For Construction |
| Abandoned |
Metro Vancouver Sanitary Mains (9)
Water Mains (10)
| Proposed |
| In Service/For Construction |
| Abandoned |
| History |
Metro Vancouver Water Mains (11)
MoTI Roads (12)
Water Courses (13)
Road Centrelines (14)
| Access Lane |
| Frontage Road |
| Highway Interchange |
| Railway |
| Road |
| Street Lane |
Drainage Group (16)
| Short Term (1 - 3 Yrs) |
| Medium Term (4 - 6 Yrs) |
| Long Term (7 - 10 Yrs) |
| Annual |
| NCP Driven |
| Upsizing Contribution |
Sanitary Group (17)
| Short Term (1 - 3 Yrs) |
| Medium Term (4 - 6 Yrs) |
| Long Term (7 - 10 Yrs) |
| Annual |
| NCP Driven |
| Upsizing Contribution |
Transporation Group (18)
| Short Term (1 - 3 Yrs) |
| Medium Term (4 - 6 Yrs) |
| Long Term (7 - 10 Yrs) |
| Annual |
| NCP Driven |
| Upsizing Contribution |
Water Group (19)
| Short Term (1 - 3 Yrs) |
| Medium Term (4 - 6 Yrs) |
| Long Term (7 - 10 Yrs) |
| Annual |
| NCP Driven |
| Upsizing Contribution |
Agricultural Land Reserve (20)
Municipal Right of Way (21)
Utility Right of Way (22)
Gas Transmission Buffer (23)
Railway Buffer (24)
|